Friday, October 8, 2010
Summer Time
This summer has not been kind to model railroading. All of my free time has been taken up with home improvement projects and an above average amount of work. Oh well as summer winds down I should be able to get back to the basement.
Friday, August 13, 2010
Phase 2 Plan
Monday, August 9, 2010
Photoshop
Saturday, August 7, 2010
Saturday, July 31, 2010
Required Reading
I like track planning books, I like to see other peoples thoughts and ideas on paper. I have a lot in my collection and just like everything else, some are better than others. A I work on the plan for phase 2 construction I have come to realize I keep coming back to these books. While they all are not track planning books the do all have valuable information.
John Armstrong's books might be a bit dated but I think some of his ideas border on sheer genius. When you consider that his Canidagua Southern plan is over 50 years old and is still better than at least 70% of the plans we see presented on the Internet forums I have to give the man some respect and mine his work for some good ideas.
Tony Koester's Lessons learned book is interesting considering he lived with the layout for 25 years and tells what did and didn't work out. I normally only learn from my own mistakes but I'll listen to experience and try to avoid a few.
Lance Mindheim's are my newest additions and I think they are among the best. His plans are nice and open, not too much track, or too many elements crammed into the space. I also like that he has drawn the plans in CAD so we know they could be built as drawn. Some of the plans use some often over looked prototypes for inspiration. The fact that they are self published is very interesting to me. I wonder if this was done to better control content, or as some sort of cost control.
The others just have good useful information in them.
Wednesday, July 28, 2010
The Current Track Plan

Here is my track plan as the layout is currently. It has a lot of short comings, most of wich I plan to correct during phase two construction.
I built this as a test bed for testing my bench work and track laying skills. When I started this project a few years ago I was concerned that I would have expansion and contraction issues because my layout is in an unfinished basement. So far I haven’t had any bench work or track work issues, derailments are very rare. My original plan was heavily influenced by the HOG layout plan.
More on it can be found here: http://hogrr.blogspot.com/
The layout as built faithfully represents the track in the city of Columbia as it was in the time I’m modeling, 1963-64. The plan for phase two is to model the rest of the branch to its main line connection at Centralia.
I built this as a test bed for testing my bench work and track laying skills. When I started this project a few years ago I was concerned that I would have expansion and contraction issues because my layout is in an unfinished basement. So far I haven’t had any bench work or track work issues, derailments are very rare. My original plan was heavily influenced by the HOG layout plan.
More on it can be found here: http://hogrr.blogspot.com/
The layout as built faithfully represents the track in the city of Columbia as it was in the time I’m modeling, 1963-64. The plan for phase two is to model the rest of the branch to its main line connection at Centralia.
Saturday, July 17, 2010
LCL Freight
From the information I have dug up LCL freight was big business on the Wabash Columbia
Branch. I have tried to include this trafic on my model of the branch. Here we see the local Sears truck picking up some boxes of new products for the stores stock. Representing this interaction of customer and railroad was a design goal of the layout.
Branch. I have tried to include this trafic on my model of the branch. Here we see the local Sears truck picking up some boxes of new products for the stores stock. Representing this interaction of customer and railroad was a design goal of the layout.
Subscribe to:
Posts (Atom)

